Transport and Traffic Planners (TTPI) Inc.

Transport and Traffic Planners (TTPI) Inc.
Transport and Traffic Planners (TTPI) Inc.
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • OFFICERS
    • Principals
    • Board of Directors
  • PROJECTS
    • Advisory Services
    • Air Transport
    • Maritime Transport
    • Road Transport
    • Rail Transport
    • Logistics Studies
    • Traffic Impact Studies
    • Traffic Survey
    • Capacity Building
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS
  • More
    • HOME
    • THE COMPANY
      • Company Profile
      • History
    • SERVICES
    • OFFICERS
      • Principals
      • Board of Directors
    • PROJECTS
      • Advisory Services
      • Air Transport
      • Maritime Transport
      • Road Transport
      • Rail Transport
      • Logistics Studies
      • Traffic Impact Studies
      • Traffic Survey
      • Capacity Building
    • CLIENTS
      • Local
      • Foreign
    • CONTACT US
    • ASSOCIATE CONSULTANTS
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • OFFICERS
    • Principals
    • Board of Directors
  • PROJECTS
    • Advisory Services
    • Air Transport
    • Maritime Transport
    • Road Transport
    • Rail Transport
    • Logistics Studies
    • Traffic Impact Studies
    • Traffic Survey
    • Capacity Building
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS

IN RESPONSE TO THE GROWING NEED OF TECHNICAL EXPERTISE IN THE AREA OF TRANSPORTATION

    Projects - Air Transport

    Proposed Iloilo Airport Arriving and Departing Passenger Interview Survey

    Duration: October 2023 – November 2023

    Client: Prime Assets Ventures, Inc. (PAVI)


    In general, the main objective of the survey is to generate base information on current transport demand characteristics of passengers travelling between Iloilo, regions in the country and other countries. 

    Kalibo Airport Passengers Terminal Interview Survey

    Duration: September 2023 – October 2023

    Client: Mega 7 Construction Corp.


    In general, the main objective of the survey is to generate base information on current transport demand characteristics of passengers travelling between Kalibo, regions in the country and other countries. 

    Kalibo Airport PPP Project Support Services

    Duration: November 2022 – January 2023 

    Client: Mega7 Construction Corporation
     

    TTPI was commissioned by Mega 7 Construction Corporation for the support services for the Kalibo Airport PPP Project. The scope services provided by TTPI are as follows:

    • Review air traffic forecasts and update as appropriate
    • Review project scope of work and consider phasing as appropriate

    New Panglao Airport Demand Study

    Duration: July 2018 - October 2018

    Client:  Professional Management and Consulting Services (PMACS)


    The main objective of the study is to forecast the volume of passengers that will be using the New Panglao International Airport. 

    Sangley Airport Road Traffic Study

    Duration: April 2018 - July 2018

    Client:  CAVITEX Holdings, Inc.


    Transport and Traffic Planners (TTPI) Inc. was commissioned as consultant for the conduct of a traffic study to determine airport-related traffic impacts on the road network of Cavite and vital links to Metro Manila.

    Three Airports Air Traffic Demand and Technical Study

    Duration: January 2018 - April 2018

    Client:  Professional Management and Consulting Services (PMAC)


    The objective of the technical study is to determine the passenger demand for the three airports below:

    • Iloilo
    • Puerto Princesa
    • Cagayan de Oro

    MCIAA Air Passenger Traffic Study for the Mactan-Cebu International Airport Project

    Duration: July 2013 – August 2013

    Client:  San Miguel Holdings Corp.


    The study is being undertaken by TTPI to assist SMC in the Preparation of Bid Form TP2-2 (Passenger Traffic Forecast; Approach and Detailed Assumptions in Projecting Passenger Traffic Forecast) for the Mactan Cebu International Airport Development Project. 

    Tacloban and Zamboanga Airports Development Project

    Duration: November 2008 - December 2008

    Client:  Department of Transportation and Communications


    Tacloban and Zamboanga Airports Development Project: Passengers Interview Survey

    Subcontracted by: Philippine Japan Airport Consultants, Inc. (PhilJAC)


    The company was contracted to conduct airline passenger interview surveys to generate basic information on passenger travel pattern (i.e., origin-destination, trip purpose, etc.) which are vital to passenger demand forecasting. 

    Proposed Kabankalan Airport Pre-FS and Masterplan Study

    Duration: September 2008 - November 2008

    Client:  Department of Transportation and Communications


    The company conducted a financial and economic feasibility study of the proposed Kabankalan Airport in Negros Occidental. It generated information on passenger travel characteristics through airline passengers interview surveys, which were used as inputs in passenger demand forecasting. 

    Southern Luzon International Airport (New Legaspi Airport)

    Duration: April 2008 - May 2008

    Client:  Department of Transportation and Communications


    Southern Luzon International Airport (New Legaspi Airport) - Air Passenger Interview Survey Subcontracted by: TCGI Engineers


    The company was contracted to conduct airline passengers interview surveys to generate basic information on passenger travel pattern (i.e., origin-destination, trip purpose, etc.) which are vital to passenger demand forecasting. 

    Copyright © 2024 Transport and Traffic Planners (TTPI) Inc. - All Rights Reserved.

    • SERVICES
    • CONTACT US

    Powered by Menos Online

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept