Transport and Traffic Planners (TTPI) Inc.

Transport and Traffic Planners (TTPI) Inc.
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • PROJECTS
    • Road Transport
    • Traffic Survey
    • Advisory Services
    • Capacity Building
    • Logistics Studies
    • Traffic Impact Studies
    • Rail Transport
    • Maritime Transport
    • Air Transport
  • GALLERY
  • OFFICERS
    • Principals
    • Board of Directors
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS
  • More
    • HOME
    • THE COMPANY
      • Company Profile
      • History
    • SERVICES
    • PROJECTS
      • Road Transport
      • Traffic Survey
      • Advisory Services
      • Capacity Building
      • Logistics Studies
      • Traffic Impact Studies
      • Rail Transport
      • Maritime Transport
      • Air Transport
    • GALLERY
    • OFFICERS
      • Principals
      • Board of Directors
    • CLIENTS
      • Local
      • Foreign
    • CONTACT US
    • ASSOCIATE CONSULTANTS
Transport and Traffic Planners (TTPI) Inc.
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • PROJECTS
    • Road Transport
    • Traffic Survey
    • Advisory Services
    • Capacity Building
    • Logistics Studies
    • Traffic Impact Studies
    • Rail Transport
    • Maritime Transport
    • Air Transport
  • GALLERY
  • OFFICERS
    • Principals
    • Board of Directors
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS

Projects - Air Transport

Proposed Iloilo Airport Arriving and Departing Passenger Interview Survey

Duration: October 2023 – November 2023

Client: Prime Assets Ventures, Inc. (PAVI)


In general, the main objective of the survey is to generate base information on current transport demand characteristics of passengers travelling between Iloilo, regions in the country and other countries. 

Kalibo Airport Passengers Terminal Interview Survey

Duration: September 2023 – October 2023

Client: Mega 7 Construction Corp.


In general, the main objective of the survey is to generate base information on current transport demand characteristics of passengers travelling between Kalibo, regions in the country and other countries. 

Kalibo Airport PPP Project Support Services

Duration: November 2022 – January 2023 

Client: Mega7 Construction Corporation
 

TTPI was commissioned by Mega 7 Construction Corporation for the support services for the Kalibo Airport PPP Project. The scope services provided by TTPI are as follows:

  • Review air traffic forecasts and update as appropriate
  • Review project scope of work and consider phasing as appropriate

New Panglao Airport Demand Study

Duration: July 2018 - October 2018

Client:  Professional Management and Consulting Services (PMACS)


The main objective of the study is to forecast the volume of passengers that will be using the New Panglao International Airport. 

Sangley Airport Road Traffic Study

Duration: April 2018 - July 2018

Client:  CAVITEX Holdings, Inc.


Transport and Traffic Planners (TTPI) Inc. was commissioned as consultant for the conduct of a traffic study to determine airport-related traffic impacts on the road network of Cavite and vital links to Metro Manila.

Three Airports Air Traffic Demand and Technical Study

Duration: January 2018 - April 2018

Client:  Professional Management and Consulting Services (PMAC)


The objective of the technical study is to determine the passenger demand for the three airports below:

  • Iloilo
  • Puerto Princesa
  • Cagayan de Oro

MCIAA Air Passenger Traffic Study for the Mactan-Cebu International Airport Project

Duration: July 2013 – August 2013

Client:  San Miguel Holdings Corp.


The study is being undertaken by TTPI to assist SMC in the Preparation of Bid Form TP2-2 (Passenger Traffic Forecast; Approach and Detailed Assumptions in Projecting Passenger Traffic Forecast) for the Mactan Cebu International Airport Development Project. 

Tacloban and Zamboanga Airports Development Project

Duration: November 2008 - December 2008

Client:  Department of Transportation and Communications


Tacloban and Zamboanga Airports Development Project: Passengers Interview Survey

Subcontracted by: Philippine Japan Airport Consultants, Inc. (PhilJAC)


The company was contracted to conduct airline passenger interview surveys to generate basic information on passenger travel pattern (i.e., origin-destination, trip purpose, etc.) which are vital to passenger demand forecasting. 

Proposed Kabankalan Airport Pre-FS and Masterplan Study

Duration: September 2008 - November 2008

Client:  Department of Transportation and Communications


The company conducted a financial and economic feasibility study of the proposed Kabankalan Airport in Negros Occidental. It generated information on passenger travel characteristics through airline passengers interview surveys, which were used as inputs in passenger demand forecasting. 

Southern Luzon International Airport (New Legaspi Airport)

Duration: April 2008 - May 2008

Client:  Department of Transportation and Communications


Southern Luzon International Airport (New Legaspi Airport) - Air Passenger Interview Survey Subcontracted by: TCGI Engineers


The company was contracted to conduct airline passengers interview surveys to generate basic information on passenger travel pattern (i.e., origin-destination, trip purpose, etc.) which are vital to passenger demand forecasting. 


Copyright © 2026 Transport and Traffic Planners (TTPI) Inc. - All Rights Reserved.

  • SERVICES
  • GALLERY
  • CONTACT US

Powered by Menos Online

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept