Transport and Traffic Planners (TTPI) Inc.

Transport and Traffic Planners (TTPI) Inc.
Transport and Traffic Planners (TTPI) Inc.
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • OFFICERS
    • Principals
    • Board of Directors
  • PROJECTS
    • Advisory Services
    • Air Transport
    • Maritime Transport
    • Road Transport
    • Rail Transport
    • Logistics Studies
    • Traffic Impact Studies
    • Traffic Survey
    • Capacity Building
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS
  • More
    • HOME
    • THE COMPANY
      • Company Profile
      • History
    • SERVICES
    • OFFICERS
      • Principals
      • Board of Directors
    • PROJECTS
      • Advisory Services
      • Air Transport
      • Maritime Transport
      • Road Transport
      • Rail Transport
      • Logistics Studies
      • Traffic Impact Studies
      • Traffic Survey
      • Capacity Building
    • CLIENTS
      • Local
      • Foreign
    • CONTACT US
    • ASSOCIATE CONSULTANTS
  • HOME
  • THE COMPANY
    • Company Profile
    • History
  • SERVICES
  • OFFICERS
    • Principals
    • Board of Directors
  • PROJECTS
    • Advisory Services
    • Air Transport
    • Maritime Transport
    • Road Transport
    • Rail Transport
    • Logistics Studies
    • Traffic Impact Studies
    • Traffic Survey
    • Capacity Building
  • CLIENTS
    • Local
    • Foreign
  • CONTACT US
  • ASSOCIATE CONSULTANTS

IN RESPONSE TO THE GROWING NEED OF TECHNICAL EXPERTISE IN THE AREA OF TRANSPORTATION

    Projects - Traffic Impact Studies

    Proposed Robinson Property along EDSA corner Boni and EDSA corner Pinatubo St., Mandaluyong

    Duration: January 2024 – March 2024

    Client: Robinsons Land Corporation
     

    This study is expected to achieve the following objectives :


    • To determine the adequacy of the planned road geometric characteristics and projected traffic conditions related to the major roads within the study area, considering volume generated by the various developments.
    • To determine future traffic conditions of the study area based on the proposed land use developments. This will be based on the future development plan for the project;
    • To evaluate the sufficiency of the road network capacity of the study area in relation to future traffic volumes based on the masterplan phasing developments scenario and determine corresponding potential traffic problems.
    • To prepare a traffic management plan to ensure an efficient and safe traffic flow and a responsive traffic management system in the study area. 
    • To prepare a public transport route network inside the study area to, include locations of facilities for picking and dropping of passengers.

    Proposed Wells Fargo Developments in Metro Manila

    Duration: Feb 2024 - Apr 2024

    Client: Wells Fargo & Jones Lang Lasalle 

      

    • To evaluate the existing traffic conditions of selected roads covered by this assessment;
    • To determine future traffic conditions of the study area based on the proposed land use developments. This will be based on the future development plan for the project;
    • To evaluate the sufficiency of the road network capacity of the study area in relation to future traffic volumes based on the masterplan phasing developments scenario and determine corresponding potential traffic problems.
    • To prepare a traffic management plan to ensure an efficient and safe traffic flow and a responsive traffic management system in the study area. 


    Proposed PNB-Macapagal Redevelopment Project

    Duration: Feb 2024 - Apr 2024

    Client: PNB Holdings Corp.  

      

    • Evaluate the existing traffic performance conditions for selected roads and intersections covered by this assessment;
    • Estimate the future traffic generation of the proposed development;
    • Evaluate the impact of the future traffic generation by the proposed development on the roads and intersections covered by this assessment; and,
    • To propose measures to mitigate and/or manage the traffic impact brought about by the proposed development. 

    Proposed Land Development Within South Road Property (SRP), Cebu City

    Duration: Aug 2023 – Oct 2023

    Client: Expedition Construction Corporation 

         

    The study  objectives are to determine the adequacy of the planned road geometric   characteristics and projected traffic conditions related to the major roads   within the study area, considering volume generated by the various  developments; to determine future traffic conditions of the study area based on the proposed land use developments. 


    To prepare a traffic management plan to ensure an efficient and safe traffic flow and a responsive traffic management system in the study area.

    Proposed 25-Storey Condominium Development

    Duration: Nov 2023 – Dec 2023

    Client: Lim T.K. Development Corporation


    The study objectives are to determine the adequacy of the planned road geometric characteristics and projected traffic conditions related to the major roads within the study area, considering volume generated by the various developments; to determine future traffic conditions of the study area based on the proposed land use developments. To prepare a traffic management plan to ensure an efficient and safe traffic flow and a responsive traffic management system in the study area.  

    Proposed DDCBC Three (3) Storey Building Development in Antipolo City

    Duration: May 2022 - Jun 2022

    Client: Dargo Design Component Builders Corporation (DDCBC) 


    The objective of the study is to prepare a traffic impact assessment of the proposed development and recommend traffic improvement measures as part of the LGU requirements for locational clearance. 

    Proposed Ciel de Clark 4-Storey Commercial Building, Clark, Pampanga

    Duration: Aug 2022 – Aug 2022

    Client: Model Space Design Locale. 


    The objective of the study is to prepare a traffic impact assessment of the proposed development and recommend traffic improvement measures as part of the LGU requirements for locational clearance. 

    Update of the Traffic Impact Assessment of Davao Park District

    Duration: Oct 2022 – Nov 2022 

    Client: Megaworld Corporation 


    The objective of the study is to prepare a traffic impact assessment of the proposed development and recommend traffic improvement measures as part of the LGU requirements for locational clearance. 

    Proposed Warehouse and Commercial Development in Brgy. Balagtas, Batangas City

    Duration: Oct 2022 – Nov 2022 

    Client: Monolith Construction and Development Corp. 


    The objective of the study is to prepare a traffic impact assessment of the proposed development and recommend traffic improvement measures as part of the LGU requirements for locational clearance. 

    Copyright © 2024 Transport and Traffic Planners (TTPI) Inc. - All Rights Reserved.

    • SERVICES
    • CONTACT US

    Powered by Menos Online

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept