Transport and Traffic Planners (TTPI) Inc.
Transport and Traffic Planners (TTPI) Inc.
Duration: February 2024– August 2024
Client: Ove Arup & Partners Limited for Department of Transportation
"Follow-up Survey on Roadmap for Transport Infrastructure Development for Greater Capital Region – Phase 1”
Survey Package No. 2 (2-A, 2-B,2-C): Vehicle Classification and Occupancy Survey
The Terms of Reference (TOR) has specified the following traffic surveys to be undertaken by TTPI:
The coverage of the survey composed of 109 stations within Metro Manila, Region 4A and Region 3. The data to be collected will be used for the Greater Capital Region (GCR) Railway System.
Duration: February 2024 – January 2025
Client: Davao City Government
Consultancy Service for Formulation of the Davao City Comprehensive Transport and Traffic Master Plan, and the Arterial Urban Corridor of Metropolitan Davao.
The TOR specified the twin objectives in the formulation of the Metro Davao Transportation Master Plan, notably:
Duration: March 2023– September 2023
Client: Department of Public Works and Highways (DPWH)
Consulting Services on Technical Support and Capability Enhancement on Traffic Impact Assessment (TIA) (Re-Bidding)
TTPI in Joint Venture with BB Engineers Company was awarded a contract to conduct for a Traffic Impact Assessment Technical Support Services. The objectives of the study are:
Duration: March 2023 - May 2023
Client: ALMEC Corporation for JICA
Transportation Survey for the Preparatory Study on the Project for Capacity Enhancement for Transit Oriented Development in the Philippines
TTPI was commissioned by Almec Corporation of Japan to undertake the Traffic Surveys for the Preparatory Study on the Project for Capacity Enhancement for Transit Oriented Development in the Philippines. The transportation survey aims to gather primary data that will later be analyzed to improve the public transportation system and active transportation environment within Transit Oriented Development target areas.
Duration: January 2022 – April 2022
Client: Ayala Land Inc.
The scope of works is:
Duration: February 2022 – April 2022
Client: VISIONARC
The objective of the study is to prepare a traffic impact assessment of the proposed development and recommend traffic improvement measures as part of the LGU requirements for locational clearance.
Duration: May 2022 - November 2022
Client: D.M. Wenceslao and Associates, Inc.
The study is an update of the previous undertaking conducted by this Consultant in 2019. The objectives of the study are:
Duration: August 2022 - September 2022
Client: SMC-NAIAX Corporation
The main objective of this study is to forecast vehicular traffic volume on the Project Road once it is opened and assess its impact on affected peripheral links of the existing road network particularly the EDSA/Tramo and NAIA Expressway.
Duration: October 2022 – December 2022
Client: Ayala Land Inc.
The objective of the study is to comply the DPWH requirements to re confirm the economic viability of the underpass project.
Duration: Oct 2022 – Mar 2023
Client: Monolith Construction and Development Corp.
The study has the following main objectives:
Duration: October 2022 – January 2023
Client: Maplecrest Group Inc.
The objective of the project is to prepare a Land Transportation Route Plan for the City of Imus.
Duration: November 2022 – January 2023
Client: CTII Engineering Co., Ltd (Japan)
TTPI was subcontracted by CTII of Japan to undertake the Laguna Lakeshore Road Network transport data gathering for the proposed ADB-DPWH Study. The surveys conducted are: